FacebookTwitterGoogle+Share

Administrative office

After entering the main gate, on the right side there will be a two storey building for the Peace Ling Centre office. The lower part is the reception, luggage room and small shop for daily needs and upper part is the Main office with a small veranda to rest and relax. The Peace Ling office is the main place from where we plan to expand and accomplish the Peace Ling Centre project. The building structure will be a combination of local handmade traditional bricks, while the roofing material will be concrete. The window and door will be made of hardwood.

The estimated cost

Estimated cost Rs 500,000   ($11,111)

___

Copyright Peace Ling Center, Zanskar Ladakh
Powered by Monlam Designs